India - Andhra Pradesh Disaster Recovery Project : environmental assessment (Vol. 3) : ప్యాకేజీ ఒకటి పర్యావరణ అంచనా నివేదిక, సంపుటి II (التيلغو)
الخلاصة
The development objective of the Andhra Pradesh Disaster Recovery Project for India is to restore, improve and enhance resilience of public services, environmental facilities, and livelihoods in targeted communities of Andhra Pradesh, and increase the...
انظر المزيد +
The development objective of the Andhra Pradesh Disaster Recovery Project for India is to restore, improve and enhance resilience of public services, environmental facilities, and livelihoods in targeted communities of Andhra Pradesh, and increase the capacity of the state to respond promptly and effectively to an eligible crisis or emergency. Some of the negative impacts and mitigation measures are inlude : (i) clearing of barricaded area, for any unwarranted/waste materials, to ensure entire barricaded operational area is available for cable laying operations; (ii) cable pull out, lowering operations can pose safety concerns and therefore all work force deployed in operations are to be properly trained to keep safe distances and provided with all required PPEs like safety helmets, face masks, ear plugs, protective gear with reflective jackets and safety shoes mandatorily; (iii) trench backfilling operations do not cause any on site impacts, except for marginal increase in dust levels due to handling of fine sand; (iv) damaged and/or broken pre-cast slabs, if any during laying of pre-cast slabs is to be stored aside and transported back to work camp sites for disposal as construction debris, eventually; (v) all road side drain chutes, both upstream and downstream of operational area shall be checked and blockages, if any are to be cleared, so that road drainage will not be affected aftermath of cable laying operations; (vi) dust levels at the work camps sites is to be controlled through regular sprinkling of water through similar mobile tankers deployed at operational areas for cable laying; (vii) extreme care shall be taken not to over load the cables beyond its design load capacity, even more importantly for prolonged periods; (viii) care should also be taken to ensure that all other required authorizations are obtained prior to the commencement of works.
رؤية أقل ـ