الوثائق والتقارير

البحث عن/استعراض الوثائق


  

قام بتنقيحها:

تنقيح حسب:

انظر المزيد +
انظر المزيد +
انظر المزيد +
  • إظهار 1 - 20 نتيجة من 31697 نتيجة
  • عرض النتائج في مجموعات من
  • 10
  • 20
  • 50
تنزيل إلى ملف Excel [x]
China - Shanxi Coal Bed Methane Development and Utilization Project : restructuring (الإنجليزية)

The objective of the Shanxi Coal Bed Methane Development and Utilization Project for China is to assist Shanxi Province in increasing the production and utilization of CBM/CMM to replace coal as a fuel for thermal use and to reduce GHGs and local air pollutants associated with coal combustion. ... انظر المزيد +

وثيقة المشروع RES22208 FEB 09, 2016

Peng,Ximing

India - Himachal Pradesh Horticulture Development Project : environmental assessment : Environmental and social management framework (الإنجليزية)

The objective of the Himachal Pradesh Horticulture Development Project for India is to increase the productivity, profitability and market access of selected horticulture commodities in Himachal Pradesh. ... انظر المزيد +

تقييم بيئي SFG1759 FEB 03, 2016

Pathy,Manivannan

Indonesia - National Urban Slum Upgrading Program Project : indigenous peoples plan : Environmental and social management framework : draft for review (الإنجليزية)

The objective of the National Urban Slum Upgrading Program Project is to improve access to basic urban services in targeted slums in Indonesia. ... انظر المزيد +

خطة الشعوب الأصلية SFG1748 FEB 03, 2016

Sari,Kumala

Indonesia - National Urban Slum Upgrading Program Project : environmental assessment : Environmental and social management framework (الإنجليزية)

The objective is to improve access to basic urban services in targeted slums in Indonesia. Some of the negative impacts and mitigation measures include: limit earth moving to dry periods; protection of most susceptible soil surfaces with mulch; protection of drainage channels with berms, or fabric barriers/geo-textile; installation of sedimentation basins, seeding or planting of erodible surfaces as soon as possible; selection an alignment that reduces environmental disturbances; undertaking maintenance and repairs in a timely fashion; changing the alignment to reduce steep grades when possible; building civil works to stabilize side slopes, terracing or retaining wall installation; using vegetative treatments to stabilize side slopes or prevent erosion; using special treatments to overcome ground water problems, such as drains; regular monitoring and inventory of risks for erosion; conduct solid waste segregation to separate the organic and inorganic waste; contain the leachate in cemented bundling floor and channeled to settling tank before discharged; and cover organic waste for faster composting and prevent odor. ... انظر المزيد +

تقييم بيئي SFG1747 FEB 03, 2016

Sari,Kumala

Cameroon - Flood Emergency Project : procurement plan : Cameroun - Projet d’Urgence de lutte contre les Inondations : plan de passation (الفرنسية)

خطة التوريدات 103116 FEB 02, 2016

South Africa economic update : promoting faster growth and poverty alleviation through competition (الإنجليزية)

Promoting faster growth and poverty alleviation through competition is particularly important for South Africa, which is facing weak economic growth and limited fiscal resources and has to look to avenues outside the fiscal space to stimulate faster sustainable growth and progress towards its ultimate goal of eliminating poverty, outlined in the 2030 National Development Plan (NDP). ... انظر المزيد +

ورقة عمل (سلسلة مُرقمة) 103057 FEB 01, 2016

Purfield,Catriona Mary; Hanusch,Marek; Algu,Yashvir; Begazo Gomez,Tania Priscilla; Martinez Licetti,Martha; Nyman,Sara

Zimbabwe Economic Update - Changing growth patterns : improving health outcomes (الإنجليزية)

Low export prices and high production costs are contributing to a persistent deficit in the external accounts. Despite narrowing somewhat in recent years, Zimbabwe’s current account deficit remains much larger than those of comparable countries in the region, and exports currently amount to just over half of imports. ... انظر المزيد +

ورقة عمل 103601 FEB 01, 2016

Herderschee,Johannes

Kyrgyz Republic - Agricultural sector risk assessment (الإنجليزية)

Agriculture is among the most risk-prone sectors in the economies of Central Asia. Production shocks from weather, pests and diseases and adverse movements in agricultural product and input prices not only impact farmers and agri-business firms, but can also strain government finances. ... انظر المزيد +

ورقة عمل 103078 FEB 01, 2016

Broka,Sandra; Giertz, Åsa; Christensen,Garry N.; Hanif,Charity Worsham; Rasmussen,Debra L.; Rubaiza,Rhoda

Tajikistan - Agricultural sector risk assessment (الإنجليزية)

Agriculture is among the most risk-prone sectors in the economies of Central Asia. Production shocks from weather, pests and diseases and adverse movements in agricultural product and input prices not only impact farmers and agri-business firms, but can also strain government finances. ... انظر المزيد +

ورقة عمل 103077 FEB 01, 2016

Broka,Sandra; Giertz, Åsa; Christensen,Garry N.; Hanif,Charity Worsham; Rasmussen,Debra L.

Sri Lanka - Ending poverty and promoting shared prosperity : a systematic country diagnostic (الإنجليزية)

Sri Lanka is in many respects a development success story. With economic growth averaging more than 7 percent a year over the past five years on top of an average growth of 6 percent the preceding five years, Sri Lanka has made notable strides towards the goals of ending extreme poverty and promoting shared prosperity (the ‘twin goals’). ... انظر المزيد +

Systematic Country Diagnostic 103246 FEB 01, 2016

India - National Ganga River Basin Project : environmental assessment (Vol. 13) : Environment and social management plan for sewerage and STP scheme in Halisahar town, West Bengal (الإنجليزية)

The development objectives of the National Ganga River Basin Project for India are to support the national Ganga river basin authority (NGRBA) in: (a) building capacity of its nascent operational-level institutions, so that they can manage the long-term Ganga clean-up and conservation program; and (b) implementing a diverse set of demonstrative investments for reducing point-source pollution loads in a sustainable manner, at priority locations on the Ganga. ... انظر المزيد +

تقييم بيئي SFG1690 FEB 01, 2016

Singh,Sunita

India - National Ganga River Basin Project : environmental assessment (Vol. 12) : Environmental and social assessment with management plan for sewerage works of Muni Ki Reti - Dhalwala (الإنجليزية)

The development objectives of the National Ganga River Basin Project for India are to support the national Ganga river basin authority (NGRBA) in: (a) building capacity of its nascent operational-level institutions, so that they can manage the long-term Ganga clean-up and conservation program; and (b) implementing a diverse set of demonstrative investments for reducing point-source pollution loads in a sustainable manner, at priority locations on the Ganga. ... انظر المزيد +

تقييم بيئي SFG1690 FEB 01, 2016

Singh,Sunita

India - National Ganga River Basin Project : environmental assessment (Vol. 11) : Environmental and social assessment and management plan for development of sewerage system in Barrackpore municipality under NGRBA (الإنجليزية)

The development objectives of the National Ganga River Basin Project for India are to support the national Ganga river basin authority (NGRBA) in: (a) building capacity of its nascent operational-level institutions, so that they can manage the long-term Ganga clean-up and conservation program; and (b) implementing a diverse set of demonstrative investments for reducing point-source pollution loads in a sustainable manner, at priority locations on the Ganga. ... انظر المزيد +

تقييم بيئي SFG1690 FEB 01, 2016

Singh,Sunita

Uganda - Second Kampala Institutional and Infrastructure Development Project : resettlement plan : Resettlement action plan : narrative section (الإنجليزية)

The objective of the Second Kampala Institutional and Infrastructure Development Project for Uganda is to deepen the institutional reforms and enhance city infrastructure to improve urban mobility and foster economic development. ... انظر المزيد +

خطة إعادة التوطين SFG1745 FEB 01, 2016

Byansansa,Annette Nabisere

India - National Ganga River Basin Project : environmental and social impact assessment and management framework (Vol. 9) : Environmental and social assessment with management plan for Anupshahar sewerage scheme (Distt Bulandshahar) (الإنجليزية)

The development objectives of the National Ganga River Basin Project for India are to support the national Ganga river basin authority (NGRBA) in: (a) building capacity of its nascent operational-level institutions, so that they can manage the long-term Ganga clean-up and conservation program; and (b) implementing a diverse set of demonstrative investments for reducing point-source pollution loads in a sustainable manner, at priority locations on the Ganga. ... انظر المزيد +

تقييم بيئي SFG1690 FEB 01, 2016

Singh,Sunita

Nigeria - Erosion and Watershed Management Project : environmental assessment (Vol. 7) : Final report of environmental and social management plan for the Umueshi gully erosion site, Ideato South, Imo state (الإنجليزية)

The objective of the Erosion and Watershed Management Project for Nigeria is to reduce vulnerability to soil erosion in targeted sub-watersheds. ... انظر المزيد +

تقييم بيئي SFG1692 FEB 01, 2016

Olatunji,Iretomiwa

India - National Ganga River Basin Project : environmental and social impact assessment and management framework (Vol. 8) : Environmental and social assessment with management plan for sewerage works in sewerage district ‘C’ of Allahabad City, Uttar Pradesh (الإنجليزية)

The development objectives of the National Ganga River Basin Project for India are to support the national Ganga river basin authority (NGRBA) in: (a) building capacity of its nascent operational-level institutions, so that they can manage the long-term Ganga clean-up and conservation program; and (b) implementing a diverse set of demonstrative investments for reducing point-source pollution loads in a sustainable manner, at priority locations on the Ganga. ... انظر المزيد +

تقييم بيئي SFG1690 FEB 01, 2016

Singh,Sunita

India - National Ganga River Basin Project : environmental and social impact assessment and management framework (Vol. 7) : Environmental and social assessment with management plan for sewerage works in Sewerage District of Allahabad City, Uttar Pradesh (الإنجليزية)

The development objectives of the National Ganga River Basin Project for India are to support the national Ganga river basin authority (NGRBA) in: (a) building capacity of its nascent operational-level institutions, so that they can manage the long-term Ganga clean-up and conservation program; and (b) implementing a diverse set of demonstrative investments for reducing point-source pollution loads in a sustainable manner, at priority locations on the Ganga. ... انظر المزيد +

تقييم بيئي SFG1690 FEB 01, 2016

Singh,Sunita

Uganda - Second Phase of the Kampala Infrastructure and Institutional Development Project : environmental and social impact assessment (الإنجليزية)

The development objective of the Second Phase of the Kampala Infrastructure and Institutional Development Project for Uganda is enhanced infrastructure and institutional capacity of Kampala Capital City Authority (KCCA) to improve urban mobility in Kampala. ... انظر المزيد +

تقييم بيئي SFG1757 FEB 01, 2016

Byansansa,Annette Nabisere

مسمى الوثيقة تاريخ الوثيقة رقم التقرير نوع الوثيقة متاح أيضا في
Lao People’s Democratic Republic - Second Phase of Lao Environment and Social Project (LENS2) : Implementation support mission - May 4 to 27, 2015 (الإنجليزية)
انظر المزيد +
JUN 30, 2016 102665 مذكرة
China - Shanxi Coal Bed Methane Development and Utilization Project : restructuring (الإنجليزية)
انظر المزيد +
FEB 09, 2016 RES22208 وثيقة المشروع
India - Himachal Pradesh Horticulture Development Project : environmental assessment : Environmental and social management framework (الإنجليزية)
انظر المزيد +
FEB 03, 2016 SFG1759 تقييم بيئي
Indonesia - National Urban Slum Upgrading Program Project : indigenous peoples plan : Environmental and social management framework : draft for review (الإنجليزية)
انظر المزيد +
FEB 03, 2016 SFG1748 خطة الشعوب الأصلية
Indonesia - National Urban Slum Upgrading Program Project : environmental assessment : Environmental and social management framework (الإنجليزية)
انظر المزيد +
FEB 03, 2016 SFG1747 تقييم بيئي
Cameroon - Flood Emergency Project : procurement plan : Cameroun - Projet d’Urgence de lutte contre les Inondations : plan de passation (الفرنسية)
انظر المزيد +
FEB 02, 2016 103116 خطة التوريدات
South Africa economic update : promoting faster growth and poverty alleviation through competition (الإنجليزية)
انظر المزيد +
FEB 01, 2016 103057 ورقة عمل (سلسلة مُرقمة)
Zimbabwe Economic Update - Changing growth patterns : improving health outcomes (الإنجليزية)
انظر المزيد +
FEB 01, 2016 103601 ورقة عمل
Kyrgyz Republic - Agricultural sector risk assessment (الإنجليزية)
انظر المزيد +
FEB 01, 2016 103078 ورقة عمل
Tajikistan - Agricultural sector risk assessment (الإنجليزية)
انظر المزيد +
FEB 01, 2016 103077 ورقة عمل
Sri Lanka - Ending poverty and promoting shared prosperity : a systematic country diagnostic (الإنجليزية)
انظر المزيد +
FEB 01, 2016 103246 Systematic Country Diagnostic
India - National Ganga River Basin Project : environmental assessment (Vol. 13) : Environment and social management plan for sewerage and STP scheme in Halisahar town, West Bengal (الإنجليزية)
انظر المزيد +
FEB 01, 2016 SFG1690 تقييم بيئي
India - National Ganga River Basin Project : environmental assessment (Vol. 12) : Environmental and social assessment with management plan for sewerage works of Muni Ki Reti - Dhalwala (الإنجليزية)
انظر المزيد +
FEB 01, 2016 SFG1690 تقييم بيئي
India - National Ganga River Basin Project : environmental assessment (Vol. 11) : Environmental and social assessment and management plan for development of sewerage system in Barrackpore municipality under NGRBA (الإنجليزية)
انظر المزيد +
FEB 01, 2016 SFG1690 تقييم بيئي
Uganda - Second Kampala Institutional and Infrastructure Development Project : resettlement plan : Resettlement action plan : narrative section (الإنجليزية)
انظر المزيد +
FEB 01, 2016 SFG1745 خطة إعادة التوطين
India - National Ganga River Basin Project : environmental and social impact assessment and management framework (Vol. 9) : Environmental and social assessment with management plan for Anupshahar sewerage scheme (Distt Bulandshahar) (الإنجليزية)
انظر المزيد +
FEB 01, 2016 SFG1690 تقييم بيئي
Nigeria - Erosion and Watershed Management Project : environmental assessment (Vol. 7) : Final report of environmental and social management plan for the Umueshi gully erosion site, Ideato South, Imo state (الإنجليزية)
انظر المزيد +
FEB 01, 2016 SFG1692 تقييم بيئي
India - National Ganga River Basin Project : environmental and social impact assessment and management framework (Vol. 8) : Environmental and social assessment with management plan for sewerage works in sewerage district ‘C’ of Allahabad City, Uttar Pradesh (الإنجليزية)
انظر المزيد +
FEB 01, 2016 SFG1690 تقييم بيئي
India - National Ganga River Basin Project : environmental and social impact assessment and management framework (Vol. 7) : Environmental and social assessment with management plan for sewerage works in Sewerage District of Allahabad City, Uttar Pradesh (الإنجليزية)
انظر المزيد +
FEB 01, 2016 SFG1690 تقييم بيئي
Uganda - Second Phase of the Kampala Infrastructure and Institutional Development Project : environmental and social impact assessment (الإنجليزية)
انظر المزيد +
FEB 01, 2016 SFG1757 تقييم بيئي