الوثائق والتقارير

البحث عن/استعراض الوثائق


  

قام بتنقيحها:

تنقيح حسب:

انظر المزيد +
انظر المزيد +
انظر المزيد +
  • إظهار 1 - 20 نتيجة من 18976 نتيجة
  • عرض النتائج في مجموعات من
  • 10
  • 20
  • 50
تنزيل إلى ملف Excel [x]
Statement by Ms. Marie-Gabrielle Ineichen-Fleisch at the 89th meeting of the Development Committee held on April 12, 2014 (الإنجليزية)

This is a statement by Ms. Marie-Gabrielle Ineichen-Fleisch, State Secretary for Economic Affairs, Swiss Confederation at the eighty-ninth meeting of the Development Committee held on April 12, 2014. ... انظر المزيد +

تقرير مجلس المديرين التنفيذيين 86983 APR 12, 2014

Ineichen-Fleisch, Marie-Gabrielle

Tanzania - Partial Risk Guarantees in Energy Sector Project : Environmental Assessment (الإنجليزية)

تقييم بيئي E4523 APR 07, 2014

Guinea-Bissau - Emergency Water and Electricity Services Upgrading Project : environmental assessment : Environmental and Social Screening and Assessment Framework (ESSAF) (الإنجليزية)

The objective of the Emergency Water and Electricity Services Upgrading Project is: (i) to restore and increase the access of the population of Bissau to safe water and to improve the quality of water services; and (ii) to improve the reliability of electricity supply to the population of Bissau. ... انظر المزيد +

تقييم بيئي E4519 APR 03, 2014

Reducing black carbon emissions from diesel vehicles : impacts, control strategies, and cost-benefit analysis (الإنجليزية)

A 2013 scientific assessment of black carbon emissions and impacts found that black carbon is second to carbon dioxide in terms of its climate forcing. ... انظر المزيد +

ورقة عمل 86485 APR 02, 2014

Minjares, Ray; Wagner, David Vance; Baral, Anil; Chambliss, Sarah; Galarza, Sebastian; Posada, Francisco; Sharpe, Ben; Wu, Grace; Blumberg, Kate; Kamakate, Fanta; Lloyd, Alan; Kojima, Masami; Hamilton, Kirk; Johnson, Todd; Kopp, Andreas; Hosier, Richard; Akbar, Sameer

Pakistan - Multi Donor Trust Fund (MDTF) Khyber-Pakhtunkhwa (KP) Emergency Roads Recovery Project : environmental assessment (الإنجليزية)

The objective of the Multi Donor Trust Fund (MDTF) Khyber-Pakhtunkhwa (KP) Emergency Roads Recovery Project for Pakistan is to enable the population along the project corridor to benefit from year round improved access and mobility through reconstruction of priority damaged roads and bridges in the conflict hit areas. ... انظر المزيد +

تقييم بيئي E4526 APR 02, 2014

Tanzania - Additional Financing for the Strategic Cities Project : environmental assessment (Vol. 2 of 3) : Environmental and social impact assessment for up-grading of Duga-airport road located in Tanga city (الإنجليزية)

The development objective of the Additional Financing for the Strategic Cities Project for Tanzania is to improve the quality of and access to basic urban services in seven elected participating local government authorities (LGAs). ... انظر المزيد +

تقييم بيئي E4516 APR 01, 2014

Tanzania - Additional Financing for the Strategic Cities Project : environmental assessment (Vol. 3 of 3) : Environmental and social impact assessment for up-grading of Unga limited to Muriet road and Burka bridge located in Arusha city (الإنجليزية)

The development objective of the Additional Financing for the Strategic Cities Project for Tanzania is to improve the quality of and access to basic urban services in seven elected participating local government authorities (LGAs). ... انظر المزيد +

تقييم بيئي E4516 APR 01, 2014

Armenia - Additional Financing for the Electricity Supply Reliability Project : environmental assessment (Vol. 1 of 3) : Environmental management plan for rehabilitation of Charentsavan-3 substation (الإنجليزية)

The development objective of the Additional Financing for the Electricity Supply Reliability Project for Armenia is to increase the reliability and capacity of the transmission network. ... انظر المزيد +

تقييم بيئي E4525 APR 01, 2014

Armenia - Additional Financing for the Electricity Supply Reliability Project : environmental assessment (Vol. 2 of 3) : Environmental management plan for rehabilitation and expansion of Haghtanak substation (الإنجليزية)

The development objective of the Additional Financing for the Electricity Supply Reliability Project for Armenia is to increase the reliability and capacity of the transmission network. ... انظر المزيد +

تقييم بيئي E4525 APR 01, 2014

Armenia - Additional Financing for the Electricity Supply Reliability Project : environmental assessment (Vol. 3 of 3) : Environmental management plan for rehabilitation of Vanadzor-1 substation (الإنجليزية)

The development objective of the Additional Financing for the Electricity Supply Reliability Project for Armenia is to increase the reliability and capacity of the transmission network. ... انظر المزيد +

تقييم بيئي E4525 APR 01, 2014

Saint Vincent the Grenadines - Additional Financing for the Regional Disaster Vulnerability Reduction Project : environmental management framework (الإنجليزية)

The development objective of the Additional Financing for the Regional Disaster Vulnerability Reduction Project for Saint Vincent the Grenadines is to measurably reduce vulnerability to natural hazards and climate change impacts and to create some level of resilience at a national level. ... انظر المزيد +

تقييم بيئي E4433 APR 01, 2014

Transport for health : the global burden of disease from motorized road transport (الإنجليزية)

This report summarizes the findings of a long and meticulous journey of data gathering and analysis to quantify the health losses from road deaths and injuries worldwide, as part of the path-finding Global Burden of Disease (GBD) study. ... انظر المزيد +

المطبوعات 86304 MAR 31, 2014

Bhalla, Kavi; Shotten, Marc; Cohen, Aaron; Brauer, Michael; Shahraz, Saeid; Burnett, Richard; Leach-Kemon, Katherine; Freedman, Greg; Murray, Christopher J. L.

Cameroon - Environmental and Social Capacity Building for the Energy Sector Project (الإنجليزية)

Ratings for the Environmental and Social Capacity Building for the Energy Sector Project for Cameroon were as follows: outcomes were moderately unsatisfactory, the risk to development outcome was moderate, the Bank performance was moderately unsatisfactory, and the Borrower performance was also moderately unsatisfactory. ... انظر المزيد +

تقرير إنجاز تنفيذ ونتائج المشروع ICR2285 MAR 31, 2014

Guyana - Secondary Education Improvement Project : environmental assessment and management plan (الإنجليزية)

The objective of the Guyana Secondary Education Improvement Project is to increase the 11th grade survival rate and the number of students that complete secondary education in Guyana's regions 3 and 4 (including Georgetown), by constructing and equipping schools, training teachers, and distributing learning materials. ... انظر المزيد +

تقييم بيئي E4480 MAR 31, 2014

Georgia - Transmission Grid Strengthening Project : environmental assessment (Vol. 2 of 3) : Environmental and social impact assessment main report (الإنجليزية)

The Transmission Grid Strengthening Project for Georgia seeks to strengthen grid access for South Western Georgia by constructing an overhead power transmission line connecting the sub stations in Akhaltsikhe and Batumi, to ensure more stable electricity supply in the region. ... انظر المزيد +

تقييم بيئي E4390 MAR 28, 2014

الجورجية, الإنجليزية

Georgia - Transmission Grid Strengthening Project : environmental assessment (Vol. 2 of 3) : Environmental and social impact assessment main report (الجورجية)

The Transmission Grid Strengthening Project for Georgia seeks to strengthen grid access for South Western Georgia by constructing an overhead power transmission line connecting the sub stations in Akhaltsikhe and Batumi, to ensure more stable electricity supply in the region. ... انظر المزيد +

تقييم بيئي E4390 MAR 28, 2014

الجورجية, الإنجليزية

Georgia - Transmission Grid Strengthening Project : environmental assessment (Vol. 3 of 3) : Environmental and social impact assessment : annexes (الإنجليزية)

The Transmission Grid Strengthening Project for Georgia seeks to strengthen grid access for South Western Georgia by constructing an overhead power transmission line connecting the sub stations in Akhaltsikhe and Batumi, to ensure more stable electricity supply in the region. ... انظر المزيد +

تقييم بيئي E4390 MAR 28, 2014

الجورجية, الإنجليزية

Argentina - Second Adaptable Program Loan (APL) for the National Highway Asset Management Project (الإنجليزية)

The overall outcome of the Second Adaptable Program Loan (APL) for the National Highway Asset Management Project for Argentina was rated moderately satifactory. ... انظر المزيد +

تقرير إنجاز تنفيذ ونتائج المشروع ICR3032 MAR 28, 2014

مسمى الوثيقة تاريخ الوثيقة رقم التقرير نوع الوثيقة متاح أيضا في
Statement by Ms. Marie-Gabrielle Ineichen-Fleisch at the 89th meeting of the Development Committee held on April 12, 2014 (الإنجليزية)
انظر المزيد +
APR 12, 2014 86983 تقرير مجلس المديرين التنفيذيين
Kyrgyz Republic - Grant for Pasture and Livestock Management Improvement Project : Environmental assessment (Vol. 3 of 6) : minutes of the Chui province western districts roundtable discussion (الإنجليزية)
انظر المزيد +
APR 11, 2014 E4534 تقييم بيئي
Tanzania - Partial Risk Guarantees in Energy Sector Project : Environmental Assessment (الإنجليزية)
انظر المزيد +
APR 07, 2014 E4523 تقييم بيئي
Tunisia - Additional Financing for the Urban Water Supply Project : environmental assessment : Tunisie - Supplementaire de financement pour le projet d'approvisionnement en eau urbain : evaluation environnementale (الفرنسية)
انظر المزيد +
APR 04, 2014 E4521 تقييم بيئي
Guinea-Bissau - Emergency Water and Electricity Services Upgrading Project : environmental assessment : Environmental and Social Screening and Assessment Framework (ESSAF) (الإنجليزية)
انظر المزيد +
APR 03, 2014 E4519 تقييم بيئي
Reducing black carbon emissions from diesel vehicles : impacts, control strategies, and cost-benefit analysis (الإنجليزية)
انظر المزيد +
APR 02, 2014 86485 ورقة عمل
Pakistan - Multi Donor Trust Fund (MDTF) Khyber-Pakhtunkhwa (KP) Emergency Roads Recovery Project : environmental assessment (الإنجليزية)
انظر المزيد +
APR 02, 2014 E4526 تقييم بيئي
Tanzania - Additional Financing for the Strategic Cities Project : environmental assessment (Vol. 2 of 3) : Environmental and social impact assessment for up-grading of Duga-airport road located in Tanga city (الإنجليزية)
انظر المزيد +
APR 01, 2014 E4516 تقييم بيئي
Tanzania - Additional Financing for the Strategic Cities Project : environmental assessment (Vol. 3 of 3) : Environmental and social impact assessment for up-grading of Unga limited to Muriet road and Burka bridge located in Arusha city (الإنجليزية)
انظر المزيد +
APR 01, 2014 E4516 تقييم بيئي
Armenia - Additional Financing for the Electricity Supply Reliability Project : environmental assessment (Vol. 1 of 3) : Environmental management plan for rehabilitation of Charentsavan-3 substation (الإنجليزية)
انظر المزيد +
APR 01, 2014 E4525 تقييم بيئي
Armenia - Additional Financing for the Electricity Supply Reliability Project : environmental assessment (Vol. 2 of 3) : Environmental management plan for rehabilitation and expansion of Haghtanak substation (الإنجليزية)
انظر المزيد +
APR 01, 2014 E4525 تقييم بيئي
Armenia - Additional Financing for the Electricity Supply Reliability Project : environmental assessment (Vol. 3 of 3) : Environmental management plan for rehabilitation of Vanadzor-1 substation (الإنجليزية)
انظر المزيد +
APR 01, 2014 E4525 تقييم بيئي
Saint Vincent the Grenadines - Additional Financing for the Regional Disaster Vulnerability Reduction Project : environmental management framework (الإنجليزية)
انظر المزيد +
APR 01, 2014 E4433 تقييم بيئي
Transport for health : the global burden of disease from motorized road transport (الإنجليزية)
انظر المزيد +
MAR 31, 2014 86304 المطبوعات
Cameroon - Environmental and Social Capacity Building for the Energy Sector Project (الإنجليزية)
انظر المزيد +
MAR 31, 2014 ICR2285 تقرير إنجاز تنفيذ ونتائج المشروع
Guyana - Secondary Education Improvement Project : environmental assessment and management plan (الإنجليزية)
انظر المزيد +
MAR 31, 2014 E4480 تقييم بيئي
Georgia - Transmission Grid Strengthening Project : environmental assessment (Vol. 2 of 3) : Environmental and social impact assessment main report (الإنجليزية)
انظر المزيد +
MAR 28, 2014 E4390 تقييم بيئي الجورجية, الإنجليزية
Georgia - Transmission Grid Strengthening Project : environmental assessment (Vol. 2 of 3) : Environmental and social impact assessment main report (الجورجية)
انظر المزيد +
MAR 28, 2014 E4390 تقييم بيئي الجورجية, الإنجليزية
Georgia - Transmission Grid Strengthening Project : environmental assessment (Vol. 3 of 3) : Environmental and social impact assessment : annexes (الإنجليزية)
انظر المزيد +
MAR 28, 2014 E4390 تقييم بيئي الجورجية, الإنجليزية
Argentina - Second Adaptable Program Loan (APL) for the National Highway Asset Management Project (الإنجليزية)
انظر المزيد +
MAR 28, 2014 ICR3032 تقرير إنجاز تنفيذ ونتائج المشروع