Skip to Main Navigation

ANNEX 1 – RO02 Jiu Rba Report (الإنجليزية)

This report is an annex of to the main modelling report (Output 5 - Report on advice provided to MWF in the preparation of draft FHRMs) in which the methodologies applied for hazard and risk mapping are described. The main modelling report highlights particular agreements that were considered additionally during the modelling activity. Each annex report summarizes per RBA and for the Danube River the water system and the models that were developed...
انظر المزيد

تفاصيل

  • 2024/3/06

  • تقرير

  • 188171

  • 1

  • رومانيا,

  • أوروبا وآسيا الوسطى,

  • 2024/3/07

  • Disclosed

  • ANNEX 1 – RO02 Jiu Rba Report

تنزيل الملفات

تقرير كامل

نسخة رسمية من الوثيقة (قد تضم توقيعات، الخ)


This document is being processed or is not available.