Skip to Main Navigation

Indonesia - Dam Operational Improvement and Safety Project (DOISP) (الإنجليزية)

Ratings for the Dam Operational Improvement and Safety Project (DOISP) for Indonesia were as follows: outcome was satisfactory, Bank performance was moderately satisfactory, and monitoring and evaluation (M and E) quality was modest. Some lessons learned included: even though the project decided against programmatic loan instruments at the outset, there was a clear intention from the start for follow-on engagement, which allowed the project to incrementally...
انظر المزيد

تفاصيل

  • 2024/6/27

  • تقرير إنجاز تنفيذ ونتائج المشروع

  • ICR6592

  • 1

  • إندونيسيا,

  • شرق آسيا والمحيط الهادئ,

  • 2024/7/10

  • Disclosed

  • Indonesia - Dam Operational Improvement and Safety Project (DOISP)


This document is being processed or is not available.