Skip to Main Navigation

Poland - Odra-Vistula Flood Management Project : Resettlement Plan (Vol. 1 of 13) : Final Report on Implementation of Measures Determined in the Land Acquisition and Resettlement Action Plan for Component 3 - Sub-Component 3B : Work Contract 3B.2 - Flood Protection Tarnobrzeg (الإنجليزية)

The development objectives of the Odra-Vistula Flood Management Project for Poland are to increase access to flood protection for people living in selected areas of the Odra and the upper Vistula river basins, and to strengthen the institutional capacity of the government to mitigate the impact if floods more effectively. Some of the negative impacts and mitigation measures include: (i) in case a project affected person without legal title or legal...
انظر المزيد

تفاصيل

  • 2023/7/06

  • خطة إعادة التوطين

  • SFG2760

  • 1

  • 13 (انظر جميع المجلدات)

  • بولندا,

  • أوروبا وآسيا الوسطى,

  • 2023/9/21

  • Disclosed

  • Final Report on Implementation of Measures Determined in the Land Acquisition and Resettlement Action Plan for Component 3 - Sub-Component 3B : Work Contract 3B.2 - Flood Protection Tarnobrzeg


This document is being processed or is not available.