Skip to Main Navigation

Argentina - Metropolitan Buenos Aires Urban Transformation Project : Environmental Assessment (Vol. 14 of 10) : Environmental and Social Management Plan : Renewal of the Network of Low Voltage Power Supply in the Massif of Barrio Padre Carlos Mugica - Lot 2 (الإسبانية)

تفاصيل

  • 2022/12/01

  • تقييم بيئي

  • SFG4428

  • 14

  • 10 (انظر جميع المجلدات)

  • الأرجنتين,

  • أمريكا اللاتينية والبحر الكاريبي,

  • 2023/1/25

  • Disclosed

  • Environmental and Social Management Plan : Renewal of the Network of Low Voltage Power Supply in the Massif of Barrio Padre Carlos Mugica - Lot 2


This document is being processed or is not available.