In 2010, Tanzania was classified as a low-income country with high population and economic growth rates that resulted in steadily increasing demand for electricity. Load shedding and unplanned outages were common because of insufficient electricity generation and the overloaded electricity transmission and distribution networks. Load shedding and unplanned outages were common because of insufficient electricity generation and the overloaded electricity...
انظر المزيد
تفاصيل
-
2024/6/18
-
تقرير تقييم أداء المشروع
-
185410
-
1
-
2024/7/11
-
Disclosed
-
Tanzania - Backbone Transmission Investment Project