The development objective of the First Phase of the Dasu Hydropower Project for Pakistan is to facilitate the expansion of electricity supply of hydro-power in Pakistan. Some of the negative impacts and mitigation measures include: (1) contractor will take extra measures to prevent fuel and other hazardous material spillage; (2) contractor will ensure zero disposal of spoils in the water bodies and take measures to prevent water pollution; (3) proper...
انظر المزيد
تفاصيل
-
2019/11/01
-
تقييم بيئي
-
SFG5884
-
3
-
2019/11/22
-
Disclosed
-
ماحولیاتی اور سماجی اثرات کی تجزیہ کار : مختصر خلاصہ
تنزيل الملفات
تقرير كامل
نسخة رسمية من الوثيقة (قد تضم توقيعات، الخ)
-
Total Downloads** : 931