The development objective of the Power Sector Guarantees Project for Nigeria is to contribute to alleviating the power supply deficit by creating a conducive environment for private sector to invest in and operate power generation companies and sell power to the state-owned bulk trader. Negative impacts include: air quality, noise pollution, soil erosion, water pollution, waste, and safety. Mitigation measures include: 1) spray surfaces prior to excavation...
انظر المزيد
تفاصيل
-
2013/12/05
-
تقييم بيئي
-
E2988
-
7
-
2013/12/05
-
Disclosed
-
Environmental impact assessment for the proposed 350 kV simple cycle gas turbine power plant, Ikorodu, LGA, Lagos State
-
study area