The planning, design and construction of the Baku-Tbilisi-Ceyhan (BTC) pipeline provides a good example of an IFC-financed project that faced a wide variety of complex and often difficult social and environmental challenges. From the outset, both the sponsor and the lenders were committed to achieving sustainable outcomes and striving to ensure that the project was constructed and operated to international best practice environmental and social standards...
انظر المزيد
تفاصيل
-
2006/9/01
-
ورقة عمل (سلسلة مُرقمة)
-
38216
-
1
-
1
-
2010/7/01
-
Disclosed
-
The Baku-Tbilisi-Ceyhan (BTC) Pipeline Project
-
small and medium size enterprise