This paper identifies issues in implementing large infrastructure projects in Pakistan. Input from key stakeholders of the construction industry (consultants, clients, and contractors) was required to gauge their perceptions about the existing problems in the industry and their suggested solutions. This was necessary to compare what the stakeholders considered were hurdles in their growth with what this study identified as the main problems within...
انظر المزيد
تفاصيل
-
2007/11/01
-
مذكرة سياسة
-
43186
-
1
-
1
-
2010/7/01
-
Disclosed
-
Local stakeholders perception survey
-
Water and Power Development Authority
تنزيل الملفات
تقرير كامل
نسخة رسمية من الوثيقة (قد تضم توقيعات، الخ)
-
Total Downloads** : 342