Ratings for the Emergency Water Supply Project for Iraq were as follows: outcomes were moderately satisfactory, the risk to development outcome was high, the Bank performance was satisfactory, and the Borrower performance was moderately satisfactory. Some lessons learned included: the project is that even in a context with ongoing conflict, political and institutional instability and constraints on movement, it is possible to support investments in...
انظر المزيد
تفاصيل
-
2016/4/30
-
تقرير إنجاز تنفيذ ونتائج المشروع
-
ICR3715
-
1
-
1
-
2016/5/05
-
Disclosed
-
Iraq - Emergency Water Supply Project
-
water supply and sanitation
تنزيل الملفات
تقرير كامل
نسخة رسمية من الوثيقة (قد تضم توقيعات، الخ)
-
Total Downloads** : 406