Ratings for the Pumped Storage Technical Assistance Project for Indonesia were as follows: outcome was moderately unsatisfactory, Bank performance was satisfactory, and monitoring and evaluation (M and E) quality was substantial. Some lessons learned included: while the award of the key civil works package was delayed, the progress with the access road construction was delayed even more and it became a gating factor on the critical path. The pressures...
انظر المزيد
تفاصيل
-
2022/6/25
-
تقرير إنجاز تنفيذ ونتائج المشروع
-
ICR5774
-
1
-
1
-
2022/7/01
-
Disclosed
-
Indonesia - Pumped Storage Technical Assistance Project
-
Economic Internal Rate of Return