The Project would upgrade Botswana's road network, encourage rural development and strengthen road maintenance. It would complete the paving of an extension of the north-south road to link with Zimbabwe; improve road access to portions of the Tuli Block and adjacent areas; strengthen the Roads Department by building a soils and materials testing laboratory and road maintenance depots, and providing consulting services and two instructors to complete...
انظر المزيد
تفاصيل
-
1980/11/30
-
تقرير عن التقييم المُسبق يعده موظفو البنك
-
3131
-
1
-
1
-
2010/6/18
-
Disclosed
-
Botswana - Fifth Road Project
-
swedish international development authority