The key objectives of the project are to : a) reduce the risks to human life and prevent damage to public and private property and infrastructure due to major floods; b) minimize disruptions to the local economy; c) provide protection against major floods for habitats and cultural property; and d) mitigate environmental degradation and health hazards caused by floods. The project consists of: 1) rehabilitating and upgrading 100 km of dikes along the...
انظر المزيد
تفاصيل
-
1992/5/05
-
تقرير عن التقييم المُسبق يعده موظفو البنك
-
10467
-
1
-
1
-
2010/6/18
-
Disclosed
-
Iran - Sistan River Flood Works Rehabilitation Project
-
social and environmental
تنزيل الملفات
تقرير كامل
نسخة رسمية من الوثيقة (قد تضم توقيعات، الخ)
-
Total Downloads** : 261