This is an environmental assessment of the Third Henan Highway Project, which connecting roads linking the existing Zhumadian-Xinyang expressway with cities and towns and highway networks. Negative environmental impacts will be mitigated as follows: to control traffic noise, entrances to facilities will be built to avoid facing roads and fences alongside the road will be raised. Borrow pits filled with solid wastes will be located in wastelands or...