The Nam Theun 2 Hydroelectricity Power Project (NT2), located in the Khammouane Province of central Lao's People Democratic Republic (Lao PDR), aims to produce electricity with a generating capacity of 1,070 MW. Most of the electricity generated (995 MW) will be sold to the Electricity Generating Authority of Thailand (EGAT) and the remaining (75 MW) sold to Electricite du Laos (EDL). The primary purpose of the existing analysis is to undertake an...
انظر المزيد
تفاصيل
-
2012/1/01
-
ورقة عمل
-
67571
-
1
-
1
-
2012/3/20
-
Disclosed
-
Economic analysis of the environmental and social impacts of the Nam Theun 2 Hydroelectricity Power Project
-
convention on international trade in endangered species
تنزيل الملفات
تقرير كامل
نسخة رسمية من الوثيقة (قد تضم توقيعات، الخ)
-
Total Downloads** : 1142