Skip to Main Navigation

Concept Integrated Safeguards Data Sheet-Integrated Safeguards Document - Hezhou Urban Water Infrastructure and Environment Improvement Project - P158622 (الإنجليزية)

تفاصيل

  • المؤلف

    GangQin

  • تاريخ الوثيقة

    2017/05/15

  • نوع الوثيقة

    Project Information and Integrated Safeguards Data Sheet

  • رقم التقرير

    PIDISDSC18464

  • مجلد رقم

    1

  • عدد المجلدات

    1

  • البلد

    الصين,

  • المنطقة

    شرق آسيا والمحيط الهادئ,

  • تاريخ الإفصاح

    2017/05/15

  • حالة الافصاح

    Disclosed

  • اسم الوثيقة

    Concept Integrated Safeguards Data Sheet-Integrated Safeguards Document - Hezhou Urban Water Infrastructure and Environment Improvement Project - P158622

  • كلمة أساسية

    Institutional Strengthening and Capacity Building;Environmental and Social Impact;wastewater collection and treatment;management of water resource;effect of climate change;flood risk management system;water quality monitoring station;integrated water resources management;Land Acquisition and Resettlement;integrated urban water management;urban flood;central urban area;surface water resource;small size cities;water resource planning;storm water drainage;flood early warning;Regional Economic Development;urban development plan;adequate water supply;data processing system;flood diversion capacity;quality and quantity;storm water sewer;international financial institution;construction of road;civil works;land and housing;Dams and Hydropower;flood control system;drinking water source;surface water quality;applicable safeguard policies;urban environmental service;integrated water management;storm water runoff;Water Resource Management;water pollution prevention;average annual rainfall;storm drainage system;Small scale hydropower;climate change screening;construction and operation;sewage collection system;urban drainage;water environment;irrigation canal;flood discharge;preparation mission;small hydroelectric;safeguard policy;water affairs;Environmental Assessment;hydropower station;engineering design;combined sewerage;mitigation measure;municipality level;basic infrastructure;dredged material;water bodies;wastewater management;surface area;water system;green growth;natural habitat;environmental concern;environmental screening;vulnerable people;cumulative impact;Social Assessment;sewage system;river dredging;land planning;construction activities;local funds;construction supervision;historical building;sewerage collection;Public Services;Ethnic Minorities;social safeguard;housing demolition;private housing;municipal agencies;resettlement activities;institutional context;flood management;national requirement;project identification;impact analysis;dam specialist;remedial work;safety status;water sector;government institution;existing dam;Proposed Investment;safeguard analysis;physical characteristic;hydrometric data;integrate water;contract management;urban population;monsoon climate;environmental challenge;public consultation;management consultant;pumping station;pollution load;sewer system;catchment area;river section;diversion system;pump station;extreme poverty;wastewater pollution;ethnic group;green space;institutional set-up;severe flood;regional flood;main river;storage capacity;ecological resource;inclusive development;wastewater tariff;water infrastructure;large pumping;installed capacity;rural area;government subsidy;sewerage network;flood event;town development;sanitation options;management service;Urban Infrastructure;ecological environment;positive impact;small cities;living condition;ecological function;green infrastructure;residential building;governmental agency;critical habitat;drainage channel;aquatic ecology;dry season;south-south cooperation;project impact;sustainable way;risk assessment;environmental analysis;proper wastewater;hydraulic model;

تنزيل الملفات

تقرير كامل

نسخة رسمية من الوثيقة (قد تضم توقيعات، الخ)