The objective of the Electricity Transmission Project is to increase the transfer capacity of the transmission network in Nigeria. Some of the negative impacts and mitigation measures include: construction of storm-water drains from the point of discharge; clearing of all existing drainage channels within the project site; effluents should be collected into impervious collectors at the point of discharge; provision of waste collection bins at appropriate...
انظر المزيد
تفاصيل
-
2020/3/01
-
تقييم بيئي
-
SFG1846
-
2
-
2020/10/21
-
Disclosed
-
Environmental and Social Management Plan for Rehabilitation and Reinforcement of 3 No. Transmission Substations (Package 3 Lot 2) at Jos (Plateau State); Gombe (Gombe State); and at Jalingo (Taraba State).
-
Environmental and Social Impact Assessment