Skip to Main Navigation

Libya - Supporting electricity sector reform : task D - strategic plan for renewable energy development : grid code for renewable sources (الإنجليزية)

Initially, the Consultant task was to develop a grid code document for connecting such onshore renewable energy projects to the Libyan power system, which we considered in other parts of the project as well. The grid code document needs to regulate a number of topics for the conventional power plants as well as it would be the first Grid Code for generator units in the Libya. The task is extended and prepared such grid code document including conventional...
انظر المزيد

تفاصيل

تنزيل الملفات

تقرير كامل

نسخة رسمية من الوثيقة (قد تضم توقيعات، الخ)


This document is being processed or is not available.