This IFC good practice note on environmental, health, and safety approaches for hydropower projects is a technical reference document with industry-specific examples of Good International Industry Practice (GIIP). This publication applies to environmental, health and safety (EHS) aspects of run-of-river diversion, run-of-river reservoir, storage reservoir, and pumped storage types of facilities (as defined in annex A). If a hydropower project requires...
انظر المزيد
تفاصيل
-
2018/3/01
-
ورقة عمل
-
125192
-
1
-
1
-
2018/4/13
-
Disclosed
-
Environmental, health, and safety approaches for hydropower projects
-
Environment
تنزيل الملفات
تقرير كامل
نسخة رسمية من الوثيقة (قد تضم توقيعات، الخ)
-
Total Downloads** : 1230