Skip to Main Navigation

This IFC good practice note on environmental, health, and safety approaches for hydropower projects is a technical reference document with industry-specific examples of Good International Industry Practice (GIIP). This publication applies to environmental, health and safety (EHS) aspects of run-of-river diversion, run-of-river reservoir, storage reservoir, and pumped storage types of facilities (as defined in annex A). If a hydropower project requires...
انظر المزيد

تفاصيل

تنزيل الملفات

تقرير كامل

نسخة رسمية من الوثيقة (قد تضم توقيعات، الخ)


This document is being processed or is not available.