Skip to Main Navigation

Chişinău heat and electricity supply institutional and financial restructuring study : phase one report (الإنجليزية)

Comprehensive reforms are acutely needed to bring about the financial stabilization of the energy sector in Chişinău. Termocom, the district heating company, has accumulated an unsustainable debt, equivalent to 3.5 percent of the national GDP – large enough to become an issue of concern between the IMF and the Government of Moldova. The direct cause of the financial deficits and debtaccumulation was a persistent failure of the Municipality, owner...
انظر المزيد

الوثيقة أيضا متوفرة بـ الرومانية

تفاصيل

  • 2011/4/01

  • ورقة عمل

  • 128350

  • 1

  • 1

  • مولدوفا,

  • أوروبا وآسيا الوسطى,

  • 2018/7/13

  • Disclosed

  • Chişinău heat and electricity supply institutional and financial restructuring study : phase one report

تنزيل الملفات

تقرير كامل

نسخة رسمية من الوثيقة (قد تضم توقيعات، الخ)


This document is being processed or is not available.