The proposed project would consist essentially of: (a) track and buildings: (i) equipment for and renewal of 21.5 km of track; (ii) ballasting of 210 km of line; (iii) joint welding of 380 km of rails; and (iv) minor repairs to bridges; (b) motive power and rolling stock: 4 main line locomotives; 5 shunting locomotives; 2 railcars; 8 trailers; 4 passenger coaches; 125 freight cars and spare parts for rolling stock; and (c) management: equipment for...
انظر المزيد
تفاصيل
-
1973/4/30
-
مذكرة وتوصيات الرئيس
-
P1177
-
1
-
1
-
2010/6/24
-
Disclosed
-
Mali - Second Railway Project
-
access to the sea
تنزيل الملفات
تقرير كامل
نسخة رسمية من الوثيقة (قد تضم توقيعات، الخ)
-
Total Downloads** : 100