Skip to Main Navigation

Botswana - Morupule B Generation and Transmission Project (Vol. 2 of 3) : Environmental impact assessment for Botswana transmission lines : executive summary (الإنجليزية)

The objectives of the Morupule B Generation and Transmission Project are to expand domestic power generation capacity that will support sustained economic growth in Botswana; and build institutional capacity for sustainable development of the energy sector. Negative measures include: loss of top soil, ground water pollution due to hydrocarbon spillage, air quality, flora and fauna, and increase in noise pollution during construction. Mitigation measures...
انظر المزيد

الوثيقة أيضا متوفرة بـ الإنجليزية, الإنجليزية

تفاصيل

تنزيل الملفات

تقرير كامل

نسخة رسمية من الوثيقة (قد تضم توقيعات، الخ)


This document is being processed or is not available.