The objective of the Electric Power Project is to increase the capacity and efficiency of gas-fired power generation in Myanmar and strengthen the institutional capacity of the Ministry of Electric Power and the Myanmar Electric Power Enterprise. Based on four site visits since July 2016, it can be stated that the already existing line corridor (water pipeline to Thaton PP and transmission line) and the erection of the pumping station with control...
انظر المزيد
الوثيقة أيضا متوفرة بـ
البورمية
تفاصيل
-
2017/10/24
-
خطة إعادة التوطين
-
SFG3720
-
1
-
1
-
2017/10/24
-
Disclosed
-
Abbreviated resettlement action plan of the water pipelines and transmission line
-
water pipeline