Skip to Main Navigation

Gabon - Second Phase of the Infrastructure And Local Development Program Project : environmental assessment (Vol. 3 of 5) : Travaux de pavage de 600 metres de la voie quarter balise au Lieu - Dit Pentecote : Port Gentil (English|French)

The Second Phase of the Infrastructure and Local Development Program Project is implemented as part of a program known as Public Interest Works for the Promotion of Entrepreneurship and Employment (TIPPEE). As part of this project, it is planned to pave 1600 m of urban road-works between PK7 Road and Expressway 2 in Libreville (5th District). Negative aspects include: 1. Air pollution; 2. Risk of erosion and landslide; 3. Destruction of property located...
انظر المزيد

تفاصيل

  • 2015/10/01

  • تقييم بيئي

  • SFG1431

  • 3

  • 5 (انظر جميع المجلدات)

  • غابون,

  • Western and Central Africa,

  • 2015/10/20

  • Disclosed

  • Travaux de pavage de 600 metres de la voie quarter balise au Lieu - Dit Pentecote : Port Gentil

  • Environmental and Social Impact

تنزيل الملفات

تقرير كامل

نسخة رسمية من الوثيقة (قد تضم توقيعات، الخ)


This document is being processed or is not available.