The objectives of the Thermal Power Project are to: enable the Volta River Authority (VRA) to maintain the country's electricity supply by providing the generating capacity to meet the electricity demand in Ghana; enhance operational efficiency through transmission and generation system improvements; moderate demand growth through economic demand management programming; strengthen the institutional capabilities of the power sector and of VRA by supporting...
انظر المزيد
تفاصيل
-
1995/1/18
-
تقرير عن التقييم المُسبق يعده موظفو البنك
-
12252
-
1
-
1
-
2010/7/01
-
Ghana - Thermal Power Project
-
Electricity
تنزيل الملفات
تقرير كامل
نسخة رسمية من الوثيقة (قد تضم توقيعات، الخ)
-
Total Downloads** : 720