Skip to Main Navigation

Laos - Greater Mekong Subregion Power Trade Projects : resettlement plan (Vol. 1 of 3) : Ban Hat-Veunkham-Stung Treng 115kv Tranmission Line Project (الإنجليزية)

The Greater Mekong Sub-region Power Trade Project consists of mainly two construction works. One is the construction of a transmission line of 82km from Ban Hat substation to Stung Treng substation. Responsibility of the Laotian side is the 25.7km distance between Ban Hat Substation and the Lao-Cambodian border. The other construction work is the expansion of the existing Ban Hat Substation to connect the above-mentioned transmission lines. Based...
انظر المزيد

الوثيقة أيضا متوفرة بـ الإنجليزية, الإنجليزية

تفاصيل


This document is being processed or is not available.