تفاصيل
-
المؤلف
Avaneesh Shukla
-
تاريخ الوثيقة
2021/03/26
-
نوع الوثيقة
خطة التوريدات
-
رقم التقرير
STEP47008
-
مجلد رقم
1
-
عدد المجلدات
1
-
البلد
-
المنطقة
-
تاريخ الإفصاح
2021/03/26
-
حالة الافصاح
Disclosed
-
اسم الوثيقة
India - SOUTH ASIA- P154283- Shared Infrastructure for Solar Parks Project - Procurement Plan
-
كلمة أساسية
Selection Under a Fixed Budget; Selection Based on Consultant; project costing; prior review; invitation to bid; procurement of work; construction of infrastructure; submission of bids; state-owned enterprise; requests for extension; Revised Plan Date; transmission line; market approach; contract completion; least cost; shared infrastructure; kv substation; Solar Parks; procurement performance; social component; credit contract; baseline survey; retroactive financing; first contract; direct contracting; procurement review; high sea; price analysis; bid validity; project plan; procurement system; foreign bidder; international access; selection method; project grant; shares of contract; media plan; technical communication; national competition; domestic preference; finance expenditures; technical proposal; framework agreement
- انظر المزيد
تنزيل الملفات
تقرير كامل
نسخة رسمية من الوثيقة (قد تضم توقيعات، الخ)
- نسخة رسمية (PDF)
- TXT*
- Total Downloads** :
- Download Stats