The activity to be conducted is the Construction of Lahendong Geothermal Power Plant Extention. The project will be situated inside the PLTP Lahendong Extention that has been operating since beginning of 2002. Mobilization and demobilization of material (metal, gravel, sand, wood, and cement) would increase noise level and would degrade environmental quality. However, increase of noise level due to the mobilization and demobilization will be only...
انظر المزيد
الوثيقة أيضا متوفرة بـ
الإنجليزية
تفاصيل
-
2007/9/13
-
تقييم بيئي
-
E1698
-
2
-
2010/7/01
-
Environmental and social due diligence
-
plant operation