The development objectives West Africa
Power Pool Fourth Adaptable Program Loan (WAPP APL4) for
First Phase of the Cote d'Ivoire, Sierra Leone,
Liberia, and Guinea Power System Re-development Project are
(i) to reduce the cost of and increase the electricity
supply at utility level, and to increase the export
capability of Côte d’Ivoire, and (ii) to increase the
technical integration of the WAPP network. Some of the
negative impacts include:...