Project data can be downloaded in groups of 500. Move the blue
circle to select a group of 500 projects for download. When
your download is finished, click the Excel icon again to
select the next group of 500 projects.
Range
×
000000
You are downloading 1 to 500 records.
إظهار 1 - 1 خاصة بـ 1 نتيجة | عرض النتائج في مجموعات من
10
|
20
|
50
This paper uses Synthetic Control Methodology to estimate the output loss in Tunisia as a result of the "Arab Spring." The results suggest that the loss was 5.5 percent, 5.1 percent, and 6.4 percent of...
نوع الوثيقة: ورقة عمل خاصة ببحوث السياساترقم التقرير: WPS7856تاريخ الوثيقة: 2016/10/11حالة الافصاح: Disclosedالمؤلف: Matta,Samer Naji,Appleton,Simon Mark,Bleaney,Michael Francis