Improving electricity access in low-income countries is a challenging problem because of the high costs of grid extension and low demand for grid electricity in rural areas. This study elucidates these...
نوع الوثيقة: ورقة عمل خاصة ببحوث السياساترقم التقرير: WPS8906تاريخ الوثيقة: 2019/06/20حالة الافصاح: Disclosedالمؤلف: Sievert,Maximiliane,Steinbuks,Jevgenijs