Skip to Main Navigation

Botswana - Morupule B Generation and Transmission Project (Vol. 1 of 3) : Environmental and social impact assessment for Morupule B power station : executive summary (English)

The objectives of the Morupule B Generation and Transmission Project are to expand domestic power generation capacity that will support sustained economic growth in Botswana; and build institutional capacity for sustainable development of the energy sector. Negative measures include: loss of top soil, ground water pollution due to hydrocarbon spillage, air quality, flora and fauna, and increase in noise pollution during construction. Mitigation measures...
See More

Document also available in : English, English

DETAILS

DOWNLOADS

COMPLETE REPORT

Official version of document (may contain signatures, etc)


Citation

Botswana - Morupule B Generation and Transmission Project (Vol. 1 of 3) : Environmental and social impact assessment for Morupule B power station : executive summary (English). Washington, DC: World Bank. http://documents.worldbank.org/curated/en/191501468199153185

This document is being processed or is not available.